Тест потока
Control consoles for D2Project
Projects
Objective:
to equip a control room for 2 operators with modern control room consoles.
Technical requirements:
Technological compartments with natural ventilation.
Modern control room furniture.
Cable management.
Wear-resistant metal frame made of high-quality structural carbon steel.
External sockets for quick access.
Brush cable inputs.
Professional articulating arms for placing one monitor with adjustment in three dimensions.
CPU shelves with fastening and fixing on the door for easy access.
Individual LED lamps for operators.
Ergonomic control chairs for round-the-clock operation with headrest.
Solution:
the task was completed on
control room consoles
series PG-5.
RDM Consoles