Тест потока

Control consoles for Sistemlink

Projects
Objective: to equip a control room for 24 operators with modern control room consoles.

Technical requirements:
  1. Mode of operation 24/7.
  2. Lifting columns with electric drive to adjust the height of the work surface with a remote control.
  3. Wear-resistant work surface with anti-static and antibacterial coating, with rounded corners and ergonomic edge.
  4. Wear-resistant metal frame made of high-quality structural carbon steel.
  5. Cable management.
  6. Professional articulating arms for placing two monitors (vertically) with adjustment in three dimensions.
  7. Rack mount for 19" equipment with multi-purpose shelf.
  8. Ergonomic control chairs for round-the-clock operation with headrest.
  9. Cabinet for papers with drawers.
  10. Patch panels, 12 ports.

Solution: the task was completed on control room consoles series PG-7.