Тест потока
Control consoles for Sistemlink
Projects
Objective:
to equip a control room for 24 operators with modern control room consoles.
Technical requirements:
Mode of operation 24/7.
Lifting columns with electric drive to adjust the height of the work surface with a remote control.
Wear-resistant work surface with anti-static and antibacterial coating, with rounded corners and ergonomic edge.
Wear-resistant metal frame made of high-quality structural carbon steel.
Cable management.
Professional articulating arms for placing two monitors (vertically) with adjustment in three dimensions.
Rack mount for 19" equipment with multi-purpose shelf.
Ergonomic control chairs for round-the-clock operation with headrest.
Cabinet for papers with drawers.
Patch panels, 12 ports.
Solution:
the task was completed on
control room consoles
series PG-7.
RDM Consoles