Тест потока

Control consoles for OOO "Kreator AV"

Projects
Objective: to equip a control room for 6 operators with modern control room consoles.

Technical requirements:
  1. Modern control consoles.
  2. Wear-resistant metal frame made of high-quality structural carbon steel.
  3. Technological compartments with natural ventilation.
  4. Quick access to cable trays.
  5. The technical compartment is equipped with cable entries from the bottom of the metal frame.
  6. Professional articulating arms for placing one monitor with adjustment in three dimensions.
  7. Power distribution units with grounding, 7 outlets.
  8. Patch panels, 12 ports.
  9. Cabinet for papers with drawers.
  10. CPU shelves with fastening and fixing on the door for easy access.

Solution: the task was completed on control room consoles series PG-5.