Control consoles for OOO "KVS"

Projects
Objective: to equip a control room for 5 operators with modern control room consoles.

Technical requirements:
  1. Cable management.
  2. External sockets for quick access.
  3. Wear-resistant metal frame made of high-quality structural carbon steel.
  4. Brush cable inputs.
  5. Separate cable trays for low-current and power wires.
  6. Professional articulating arms for placing one monitor with adjustment in three dimensions.
  7. Professional articulating arms for placing phones.
  8. Power distribution units with grounding, 7 outlets.
  9. Fans with adjustable thermostat.
  10. Ergonomic control chairs for round-the-clock operation.

Solution: the task was completed on control room consoles series PG-5.