Calculation of Cost
Your Name:
Company:
E-mail:
Mobile Phone for Fast Communication:
Tell us about your project:
Attach your project files:
(Drawings, sketches, photos, etc.)
By clicking on the button, you consent to the processing of personal data and agree to the privacy policy.
 
Тест потока

Control consoles for OOO "AME"

Projects
Objective: to equip a control room for 2 operators with modern control room consoles.

Technical requirements:
  1. Modern control room furniture.
  2. Wear-resistant metal frame made of high-quality structural carbon steel.
  3. The technical compartment is equipped with cable entries from the bottom of the metal frame.
  4. Separate cable trays for low-current and power wires.
  5. Brush cable inputs.
  6. Professional articulating arms for placing one monitor with adjustment in three dimensions.
  7. CPU shelves with fastening and fixing on the door for easy access.
  8. Power distribution units with grounding, 7 outlets with mounting on rack hinges.
  9. Patch panels, 12 ports with rack mount hinges.
  10. Fans with adjustable thermostat.

Solution: the task was completed on control room consoles series PG-5.